Communication & Electrical System Surveys
Hulkro supported the Thales Communication System and Electrical Design and installation Surveys at a number of sites including:
-
Bristol Temple meads Station
-
Upminster Control Centre
-
Highgate and Neasden Control Centres
The surveys included for:
-
As built surveys of the existing systems
-
Capturing site constraints and risks
-
Capturing site information required to specify the design and installation of the new systems
-
Capturing site information to prove, specify and design the cable route arrangements
-
Capturing site information to plan the system implementation works